So pleased with our brand new kitchen

Was quoted £4500 for fitting of the kitchen only and figured how hard can it be. My dad has every tool under the sun and can offer advice. After a full week off work and chipping away at things on weekends and evenings it’s complete ~1 month after being delivered. Really happy with the result hope you like it too. Jobs included; - remove tiles and tile adhesive with a breaker (2 tough days) - self level the floor - remove the old kitchen (1 nice day - quite satisfying) - core and do cables for additional spotlights (contracted out plastering of ceiling) - redoing mains water in and waste out to run under dishwasher as we wanted to move it to the right (awful day) - fit the kitchen units (2 days) - do the herringbone floor (3 days never again) - tile, grout, silicone (all first time doing it) submitted by /u/abriddd [link] [comments]

Apr 25, 2025 - 00:04
 0
So pleased with our brand new kitchen
So pleased with our brand new kitchen

Was quoted £4500 for fitting of the kitchen only and figured how hard can it be. My dad has every tool under the sun and can offer advice. After a full week off work and chipping away at things on weekends and evenings it’s complete ~1 month after being delivered. Really happy with the result hope you like it too.

Jobs included; - remove tiles and tile adhesive with a breaker (2 tough days) - self level the floor - remove the old kitchen (1 nice day - quite satisfying) - core and do cables for additional spotlights (contracted out plastering of ceiling) - redoing mains water in and waste out to run under dishwasher as we wanted to move it to the right (awful day) - fit the kitchen units (2 days) - do the herringbone floor (3 days never again) - tile, grout, silicone (all first time doing it)

submitted by /u/abriddd
[link] [comments]