Moslty finished my crawl space
I think i did a ok job, i still have to drill into the concrete and add the xmas tree fasteners. Just kinda nervous to do it tbh...i dont want to mess up. The old vapor barrier was prolly like 3 mil and covering 40% of the floor and not sealed anywhere. I was able to manage about 95% of the floor and sealed at every spot possible / needed. If anyone has tips on doing the concrete drilling that would be nice, like is there spots where its an absolute no no to drill into? Next project is all the rim joist, cleaning the mold residue up, insulating my sib floor. Leaning towards rock whool. submitted by /u/Exit_Future [link] [comments]

![]() | I think i did a ok job, i still have to drill into the concrete and add the xmas tree fasteners. Just kinda nervous to do it tbh...i dont want to mess up. The old vapor barrier was prolly like 3 mil and covering 40% of the floor and not sealed anywhere. I was able to manage about 95% of the floor and sealed at every spot possible / needed. If anyone has tips on doing the concrete drilling that would be nice, like is there spots where its an absolute no no to drill into? Next project is all the rim joist, cleaning the mold residue up, insulating my sib floor. Leaning towards rock whool. [link] [comments] |