My 95% finished kitchen remodel:
I wanted to show off my wife's and mine efforts around our kitchen remodel. 86-90% complete here. The last 4 cabinet doors need to finish drying so they can be hung, and the counter top needs a few more coats of poly before we're satisfied. Total cost: About $2,500 Included picking up: The back splash, PVC Fascia. A new router from Harbor Freight. A new jig saw from harbor freight. A straight edge kit from Home Depot 60- tooth blade The sink 1-10 and 2-6ft acacia butcher block counter tops from Lowe's. 1/2 gallon of polyurethane 1 pt of coffee stain Stain rags Roller brushes And a few other misc items. This remodel didn't include the appliance upgrades or the flooring, which I have done over the last 6-7 years. The last picture we had to go pull from the original MLS listing from when we bought the house. Any thoughts or suggestions on things I should change? Id love to hear it! submitted by /u/AlabamaDemocratMark [link] [comments]

![]() | I wanted to show off my wife's and mine efforts around our kitchen remodel. 86-90% complete here. The last 4 cabinet doors need to finish drying so they can be hung, and the counter top needs a few more coats of poly before we're satisfied. Total cost: About $2,500 Included picking up: The back splash, PVC Fascia. A new router from Harbor Freight. A new jig saw from harbor freight. A straight edge kit from Home Depot 60- tooth blade The sink 1-10 and 2-6ft acacia butcher block counter tops from Lowe's. 1/2 gallon of polyurethane 1 pt of coffee stain Stain rags Roller brushes And a few other misc items. This remodel didn't include the appliance upgrades or the flooring, which I have done over the last 6-7 years. The last picture we had to go pull from the original MLS listing from when we bought the house. Any thoughts or suggestions on things I should change? Id love to hear it! [link] [comments] |