Removing trim and other surface mounted items like lighting fixtures, and conduit preparing for stucco
So I’m gonna replace some areas of t1-11 siding(that is dry rotted) with like size plywood(15/32”). I have limited understanding to use z flashing for horizontal pieces and allow some gap for water to escape. But what about vertical pieces? Do I just caulk it and call it a day? The stucco crew will be going over it with their paper and metal lath. They just told me to address the dry rot which I want to do correctly. I’ve tried googling what to do for vertical flashing without much success. Thank you submitted by /u/Th3ElectrcChickn [link] [comments]
So I’m gonna replace some areas of t1-11 siding(that is dry rotted) with like size plywood(15/32”). I have limited understanding to use z flashing for horizontal pieces and allow some gap for water to escape. But what about vertical pieces? Do I just caulk it and call it a day? The stucco crew will be going over it with their paper and metal lath. They just told me to address the dry rot which I want to do correctly. I’ve tried googling what to do for vertical flashing without much success. Thank you
[link] [comments]