How should I finish the detail here at the bottom of my siding?
I was thinking of attaching a pressure treated 2x6 below the flashing so that it overlaps the foundation, then cutting the tyvek flush with the bottom of it. TIA submitted by /u/DontTouchMyBuns [link] [comments]

![]() | I was thinking of attaching a pressure treated 2x6 below the flashing so that it overlaps the foundation, then cutting the tyvek flush with the bottom of it. TIA [link] [comments] |